Hey Thursday night riders, mark your calenders!
Supplying our local commuters, athletes, and recreational riders with all their cycling needs.
24 hour repair turn around.
Open 7 days a week.
Excellent Kids Buy up Program.
Tuesday, April 23, 2013
Thursday Night Mountain Bike Ride Field Trip Planned May 2nd
Monday, April 22, 2013
Happy Earth Day!
Happy Earth Day everyone!
What a beautiful day to get out and enjoy Earth Day on your bike!
Send us some photos of you and your family out enjoying the wonderful place we live in!
Ladies, don't forget about the mountain bike ride tonight! Meet up at the shop just before 6pm. Bring some water and a snack if you need it. We will be out riding the trails for about 2 hours.
Friday, April 19, 2013
The Importance of Trail Maintenance
Designing and Building Sustainable Trails
2006 World Summit Resource: Building Sustainable Trails
Speakers: Rich Edwards, IMBA; Woody Keen, Trail Dynamics; Tony Boone, Arrowhead Trails Facilitators: Kristin Butcher and Ryan Schutz, IMBA
The speakers, all master trailbuilders, began by offering three goals they all strive for when designing and building trails: 1) limit environmental impacts; 2) keep maintenance requirements to a minimum; 3) avoid user conflicts.
They continued by offering a checklist for building sustainable contour trails. A contour trail is a path that gently traverses a hill or sideslope. It's characterized by a gentle grade, undulations called grade reversals, and a tread that usually tilts or outslopes slightly toward the outer edge. These features minimize tread erosion by allowing water to drain in a gentle, non-erosive manner called sheet flow. When water drains in thin, dispersed sheets, dirt stays where it belongs - on the trail.
Contour Trail Tips:
- Do everything you can to keep the water off the tread, and users on it
- Build on the contour and use frequent grade reversals - surf the hillside
- Follow the half-rule: A trail's grade shouldn't exceed half the grade of the sideslope
- Maximum grade should be 15 percent (except for natural or built rock structures)
- Average grade should stay under 10 percent (with grade reversals)
- Route trails to positive control points (viewpoints, water, other attractions)
- Use bench-cut construction, and excavate soil from the hillside
- For reroutes, reclaim old trail thoroughly - the visual corridor as well as the trail tread
- For highly technical trails where grade will sometimes exceed 15 percent, use natural rock, rock armoring or other rock features to add challenge and improve sustainability.
Two Critical Trailbuilding Tips
- Avoid the Fall Line
Fall-line trails usually follow the shortest route down a hill - the same path that water flows. The problem with fall-line trails is that they focus water down their length. The speeding water strips the trail of soil, exposing roots, creating gullies, and scarring the environment. - Avoid Flat Areas
Flat terrain lures many trailbuilders with the initial ease of trail construction. However, if a trail is not located on a slope, there is the potential for the trail to become a collection basin for water. The trail tread must always be slightly higher than the ground on at least one side of it so that water can drain properly.
An ideal trail will simultaneously incorporate all five sustainable trail principles.
- The Half Rule
- The 10-Percent Average Guideline
- Maximum Sustainable Grade
- Grade Reversals
- Outslope
Monday, April 15, 2013
Monday night Womens rides
Attention all women cyclists,Our weekly ride is Monday nights at 6pm.
We'll meet at the shop.
We'll stay as a group and enjoy the camaraderie.
All females of all ages and abilities welcome.
Normally an off road ride, we'll do a few road rides if there is interest.
April 22nd (next week) is our first ride of the season.
See you there.
digital print found here: http://www.claudandi.co.uk/shop/ride-like-a-girl-digital-print/
Subscribe to:
Posts (Atom)

